Two-Pod Mill - Weatherford International
• Mill 1 milled out 170 ft (52 m) in 35 hr, milling the balance of the stub (8 ft, 2.4 m) and 162 ft (49 m) of the cemented tubing. • Mill 2 milled out 111 ft (34 m) in 20 hr before a downhole motor failure, necessitating the two-pod mill be pulled, even though the mill was not worn out. • Mill 3 milled out 214 ft (65 m) in 30 hr before
